Your city
Category
Ceramics
Basins
Basins & Full Pedestals
Basins & Semi Pedestals
Vessels
Wall Hung Basins
Basin Accessories
Toilets
Back to Wall Toilets
Bidets
Close Coupled Toilets
Wall Hung Toilets
Toilet Accessories
Toilet Seats
Concealed Cisterns & Frames
Furniture
Vanity Units
Cloakroom Furniture
Counter Top Basin Units
Floor Standing Vanity Units
Wall Hung Vanity Units
Combination Packs
Fitted Furniture
Mirrors
LED Mirror Cabinets
Mirror Cabinets
Touch Sensor Mirrors
Unlit Mirrors
Furniture Accessories
Bath Panels
Furniture Extras
Storage Units
WC Units
Baths
Straight Baths
Double Ended Baths
Single Ended Baths
Shower Baths
B Shaped Shower Baths
P Shaped Shower Baths
Square Shower Baths
Freestanding Baths
Curved Baths
Whirlpool Baths
Bath Accessories
Bath Panels
Bath Screens
Bath Wastes & Extras
Showering
Shower Enclosures
Quadrants
Offset Quadrants
D Shape
Corner Entry
Side Panels
Single Entry
Shower Doors
Single Sliding Doors
Double Sliding Doors
Pivot Doors
Bi-Fold Doors
Hinged Doors
Wetrooms
Wetroom Screens
Shower Trays
Standard Shower Trays
D-Shape Trays
Offset Quadrant Trays
Quadrant Trays
Rectangular Trays
Square Trays
Slimline Shower Trays
Quadrant Trays
Square Trays
Rectangular Trays
Accessories
Wetroom Accessories
Tray Accessories
Leg Sets & Plinths
Shower Tray Wastes
Enclosure Accessories
Taps & Showers
Complete Shower Sets
Bar Mixer Shower Sets
Shower Valves & Controls
1 Outlet Valves
2 Outlet Valves
3 Outlet Valves
Bar Shower Valves
Shower Kits
Rigid Riser Kits
Shower Slide Rail Kits
Shower Accessories
Fixed Heads
Shower Arms
Hand Held Shower Kits
Body Jets
Shower Parts
Basin Taps
Mono Basin Taps
Mini Basin Taps
Tall Basin Taps
Wall Mounted Basin Taps
Pillar Taps
Bidet Taps
Bath Taps
Bath Fillers
Bath Shower Mixers
Bath Pillar Taps
Tap Accessories
Wastes
Tap Extras
Heating
Radiators
Single Panel Radiators
Double Panel Radiators
Heated Towels Rails
Traditional Column Radiators
Electric Heating
Heating Accessories
Radiator Valves
Heating Extras
Kitchens
Kitchen Sinks
Countertop Sinks
Undermount Sinks
Butler Sinks
Belfast Sinks
Cleaner Sinks/Industrial
Work Stations
Kitchen Taps
Kitchen Accessories
Bathroom Suites
Cloakroom Suites
Ceramic Suites
Doc M Packs
Toilet & Basin Sets
Enclosure Suites
Enclosures & Tray Packs
Enclosure & Showering Packs
Components (Trade)
Ceramics Components
Basin Only
Cistern Only
Pan Only
Pedestal Only
Furniture Components
Furniture Basins
Furniture Worktop
Vanity Units
Our blog
Design your own bathroom
Products
Ceramics
Basins
Basins & Full Pedestals
Basins & Semi Pedestals
Vessels
Wall Hung Basins
Basin Accessories
Toilets
Back to Wall Toilets
Bidets
Close Coupled Toilets
Wall Hung Toilets
Toilet Accessories
Toilet Seats
Concealed Cisterns & Frames
Furniture
Vanity Units
Cloakroom Furniture
Counter Top Basin Units
Floor Standing Vanity Units
Wall Hung Vanity Units
Combination Packs
Fitted Furniture
Mirrors
LED Mirror Cabinets
Mirror Cabinets
Touch Sensor Mirrors
Unlit Mirrors
Furniture Accessories
Bath Panels
Furniture Extras
Storage Units
WC Units
Baths
Straight Baths
Double Ended Baths
Single Ended Baths
Shower Baths
B Shaped Shower Baths
P Shaped Shower Baths
Square Shower Baths
Freestanding Baths
Curved Baths
Whirlpool Baths
Bath Accessories
Bath Panels
Bath Screens
Bath Wastes & Extras
Showering
Shower Enclosures
Quadrants
Offset Quadrants
D Shape
Corner Entry
Side Panels
Single Entry
Shower Doors
Single Sliding Doors
Double Sliding Doors
Pivot Doors
Bi-Fold Doors
Hinged Doors
Wetrooms
Wetroom Screens
Shower Trays
Standard Shower Trays
Slimline Shower Trays
Accessories
Wetroom Accessories
Tray Accessories
Enclosure Accessories
Taps & Showers
Complete Shower Sets
Bar Mixer Shower Sets
Shower Valves & Controls
1 Outlet Valves
2 Outlet Valves
3 Outlet Valves
Bar Shower Valves
Shower Kits
Rigid Riser Kits
Shower Slide Rail Kits
Shower Accessories
Fixed Heads
Shower Arms
Hand Held Shower Kits
Body Jets
Shower Parts
Basin Taps
Mono Basin Taps
Mini Basin Taps
Tall Basin Taps
Wall Mounted Basin Taps
Pillar Taps
Bidet Taps
Bath Taps
Bath Fillers
Bath Shower Mixers
Bath Pillar Taps
Tap Accessories
Wastes
Tap Extras
Heating
Radiators
Single Panel Radiators
Double Panel Radiators
Heated Towels Rails
Traditional Column Radiators
Electric Heating
Heating Accessories
Radiator Valves
Heating Extras
Kitchens
Kitchen Sinks
Countertop Sinks
Undermount Sinks
Butler Sinks
Belfast Sinks
Cleaner Sinks/Industrial
Work Stations
Kitchen Taps
Kitchen Accessories
Bathroom Suites
Cloakroom Suites
Ceramic Suites
Doc M Packs
Toilet & Basin Sets
Enclosure Suites
Enclosures & Tray Packs
Enclosure & Showering Packs
Components (Trade)
Ceramics Components
Basin Only
Cistern Only
Pan Only
Pedestal Only
Furniture Components
Furniture Basins
Furniture Worktop
Vanity Units
Search
Account
Orders
My points
(0)
Comparison list
Wish list
Sign in
E-mail
Password
Remember me
Sign in
Registration
Forgot your password?
Basket
Cart is empty
Home
Furniture
Furniture Accessories
Bath Panels
Synergy Berg 1500mm L Shaped Bath Panel
Search
view
Synergy Berg 1500mm L Shaped Bath Panel
SY-BEL15PAN
£
143.00
3 In Stock
Please sign in to buy
Add to wish list
Add to comparison list
Vendor
Roxor
Description
We have shower baths in both P shaped or L shaped styles with options to position the shower area at either the right or left end of the bath depending on your bathroom layout. Our shower baths are available in either standard or premier finish. Premier finished baths, although slightly more expensive, have a heavily reinforced finish on the underside of the bath which provides an ‘armour’ coating for exceptional strength and heat retention. Premier finished baths, although slightly more expensive, have a heavily reinforced finish on the underside of the bath which provides an ‘armour’ coating for exceptional strength and heat retention.
Synergy Berg 1500mm L Shaped Bath Panel
£
143.00
Please sign in to buy
Add to comparison list
Features & Benefits
High gloss white Acrylic panel.
For use with square shower baths.
Coordinating bath end panel also available.
Details
General
Brand
Synergy
Style
Contemporary
Dimensions & Capacity
Product Depth
150 mm
Product Height
500 mm
Product Width
1500 mm
Design & Materials
Colour
White
Product Material
Acrylic
Compliance & Warranty
Guarantee no. of years
5 Years
Downloads
Datasheets
SY-BEL15PAN-datasheet.pdf
File size:
15,360 Kb