Berg L Bath 1700 Panel

SY-BEL17PAN

Vendor

Description

We have shower baths in both P shaped or L shaped styles with options to position the shower area at either the right or left end of the bath depending on your bathroom layout. Our shower baths are available in either standard or premier finish. Premier finished baths, although slightly more expensive, have a heavily reinforced finish on the underside of the bath which provides an ‘armour’ coating for exceptional strength and heat retention. Premier finished baths, although slightly more expensive, have a heavily reinforced finish on the underside of the bath which provides an ‘armour’ coating for exceptional strength and heat retention.

Features & Benefits

  • The spacious and space-saving L-shaped design provides a bold and eye-catching appearance, making it a stylish addition to any bathroom setting
  • This product is manufactured using high-quality white acrylic, ensuring durability and a sleek finish
  • It is specifically compatible with the Synergy Berg 1700mm L-shaped bath, allowing for a seamless fit
  • Additionally, end panels are available for purchase separately, offering flexibility for customization and installation according to individual preferences

Details

General

Brand
Synergy
Style
Contemporary

Dimensions & Capacity

Product Depth
150 mm
Product Height
500 mm
Product Width
1700 mm

Design & Materials

Colour
European White
Product Material
Acrylic

Compliance & Warranty

Guarantee no. of years
5 Years

Downloads