Nuie 1500mm Left-Hand Square Shower Bath

WBS103
Stock due in: 25/03/2026
£548.00
On backorder

Vendor

Description

nuie Shower Baths L-Shape Square Shower Bath Left Hand 1500mm - No Leg Set
Nuie 1500mm Left-Hand Square Shower Bath

Features & Benefits

  • Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option.
  • Designed and built to the highest quality.
  • Sanitary Grade Acrylic.
  • Un-drilled.
  • Bath panels sold separately.

Details

General

Brand
Nuie
Style
Contemporary

Dimensions & Capacity

Displaced Capacity (L)
130 l
Product Height
400 mm
Product Length
1498 mm
Product Width
855 mm
Volume (Literage)
200 l

Design & Materials

Colour
White
Bath Shape
L-Shaped
Bath Style
Shower Bath
Bath Material Thickness
4 mm
Product Material
Acrylic

Installation & Compatibility

Assembly Required
No
Drilled for Taps
No
Waste Position
End Of Bath

What's Included

Includes Waste
No
Adjustable Legs Supplied
No
Bath Panel Included
No
Fixings Included
No
Includes Grips
No
Includes Overflow
No

Compliance & Warranty

Guarantee no. of years
5 Years

Downloads