Nuie 1700mm L-Shaped Left Hand Shower Bath With Screen & Side Panel

BAZSS007

Vendor

Description

Nuie 1700 Square Bath Panel & Chrome Screen - Left Hand
Nuie 1700mm L-Shaped Left Hand Shower Bath With Screen & Side Panel

Features & Benefits

  • Includes 1700mm left hand shower bath, bath screen & gloss white acrylic side panel
  • End panel not included
  • Designed and built to the highest quality
  • Sanitary Grade Acrylic
  • Un-drilled
  • Supplied with leg set

Details

General

Brand
Nuie
Style
Contemporary

Dimensions & Capacity

Displaced Capacity (L)
165 l
Glass Thickness
5 mm
Product Height
390 mm
Product Length
1700 mm
Product Width
850 mm
Volume (Literage)
235 l

Design & Materials

Colour
White
Bath Shape
L-Shaped
Bath Style
Shower Bath
Embossed Base
No
Bath Material Thickness
4 mm
Product Material
Acrylic

Installation & Compatibility

Drilled for Taps
No
Waste Position
End Of Bath

What's Included

Includes Waste
No
Adjustable Legs Supplied
Yes
Bath Panel Included
Yes
Includes Grips
No
Includes Overflow
Yes

Compliance & Warranty

Guarantee no. of years
5 Years

Downloads