Nuie 1700mm Left Hand L-Shaped Shower Bath With Bath Screen & Side Panel

BAZSS002

Vendor

Description

Nuie 1700 Square Bath Panel & Chrome Screen - Left Hand
Nuie 1700mm Left Hand L-Shaped Shower Bath With Bath Screen & Side Panel

Features & Benefits

  • Includes 1700mm left hand shower bath, bath screen & gloss white acrylic side panel
  • End panel not included
  • Designed and built to the highest quality
  • Sanitary Grade Acrylic
  • Un-drilled
  • Supplied with leg set

Details

General

Brand
Nuie
Style
Contemporary

Dimensions & Capacity

Displaced Capacity (L)
165 l
Glass Thickness
6 mm
Product Height
390 mm
Product Length
1700 mm
Product Width
850 mm
Volume (Literage)
235 l

Design & Materials

Colour
White
Bath Shape
L-Shaped
Bath Style
Shower Bath
Embossed Base
No
Bath Material Thickness
4 mm
Product Material
Acrylic,Aluminium

Installation & Compatibility

Drilled for Taps
No
Waste Position
End Of Bath

What's Included

Includes Waste
No
Adjustable Legs Supplied
Yes
Bath Panel Included
Yes
Fixings Included
Yes
Includes Grips
No
Includes Overflow
Yes

Compliance & Warranty

Guarantee no. of years
5 Years

Downloads