Your city
Category
Ceramics
Basins
Basins & Full Pedestals
Basins & Semi Pedestals
Vessels
Wall Hung Basins
Basin Accessories
Toilets
Back to Wall Toilets
Bidets
Close Coupled Toilets
Wall Hung Toilets
Toilet Accessories
Toilet Seats
Concealed Cisterns & Frames
Furniture
Vanity Units
Cloakroom Furniture
Counter Top Basin Units
Floor Standing Vanity Units
Wall Hung Vanity Units
Combination Packs
Fitted Furniture
Mirrors
LED Mirror Cabinets
Mirror Cabinets
Touch Sensor Mirrors
Unlit Mirrors
Furniture Accessories
Bath Panels
Furniture Extras
Storage Units
WC Units
Baths
Straight Baths
Double Ended Baths
Single Ended Baths
Shower Baths
B Shaped Shower Baths
P Shaped Shower Baths
Square Shower Baths
Freestanding Baths
Curved Baths
Whirlpool Baths
Bath Accessories
Bath Panels
Bath Screens
Bath Wastes & Extras
Showering
Shower Enclosures
Quadrants
Offset Quadrants
D Shape
Corner Entry
Side Panels
Single Entry
Shower Doors
Single Sliding Doors
Double Sliding Doors
Pivot Doors
Bi-Fold Doors
Hinged Doors
Wetrooms
Wetroom Screens
Shower Trays
Standard Shower Trays
D-Shape Trays
Offset Quadrant Trays
Quadrant Trays
Rectangular Trays
Square Trays
Slimline Shower Trays
Quadrant Trays
Square Trays
Rectangular Trays
Accessories
Wetroom Accessories
Tray Accessories
Leg Sets & Plinths
Shower Tray Wastes
Enclosure Accessories
Taps & Showers
Complete Shower Sets
Bar Mixer Shower Sets
Shower Valves & Controls
1 Outlet Valves
2 Outlet Valves
3 Outlet Valves
Bar Shower Valves
Shower Kits
Rigid Riser Kits
Shower Slide Rail Kits
Shower Accessories
Fixed Heads
Shower Arms
Hand Held Shower Kits
Body Jets
Shower Parts
Basin Taps
Mono Basin Taps
Mini Basin Taps
Tall Basin Taps
Wall Mounted Basin Taps
Pillar Taps
Bidet Taps
Bath Taps
Bath Fillers
Bath Shower Mixers
Bath Pillar Taps
Tap Accessories
Wastes
Tap Extras
Heating
Radiators
Single Panel Radiators
Double Panel Radiators
Heated Towels Rails
Traditional Column Radiators
Electric Heating
Heating Accessories
Radiator Valves
Heating Extras
Kitchens
Kitchen Sinks
Countertop Sinks
Undermount Sinks
Butler Sinks
Belfast Sinks
Cleaner Sinks/Industrial
Work Stations
Kitchen Taps
Kitchen Accessories
Bathroom Suites
Cloakroom Suites
Ceramic Suites
Doc M Packs
Toilet & Basin Sets
Enclosure Suites
Enclosures & Tray Packs
Enclosure & Showering Packs
Components (Trade)
Ceramics Components
Basin Only
Cistern Only
Pan Only
Pedestal Only
Furniture Components
Furniture Basins
Furniture Worktop
Vanity Units
Our blog
Design your own bathroom
Products
Ceramics
Basins
Basins & Full Pedestals
Basins & Semi Pedestals
Vessels
Wall Hung Basins
Basin Accessories
Toilets
Back to Wall Toilets
Bidets
Close Coupled Toilets
Wall Hung Toilets
Toilet Accessories
Toilet Seats
Concealed Cisterns & Frames
Furniture
Vanity Units
Cloakroom Furniture
Counter Top Basin Units
Floor Standing Vanity Units
Wall Hung Vanity Units
Combination Packs
Fitted Furniture
Mirrors
LED Mirror Cabinets
Mirror Cabinets
Touch Sensor Mirrors
Unlit Mirrors
Furniture Accessories
Bath Panels
Furniture Extras
Storage Units
WC Units
Baths
Straight Baths
Double Ended Baths
Single Ended Baths
Shower Baths
B Shaped Shower Baths
P Shaped Shower Baths
Square Shower Baths
Freestanding Baths
Curved Baths
Whirlpool Baths
Bath Accessories
Bath Panels
Bath Screens
Bath Wastes & Extras
Showering
Shower Enclosures
Quadrants
Offset Quadrants
D Shape
Corner Entry
Side Panels
Single Entry
Shower Doors
Single Sliding Doors
Double Sliding Doors
Pivot Doors
Bi-Fold Doors
Hinged Doors
Wetrooms
Wetroom Screens
Shower Trays
Standard Shower Trays
Slimline Shower Trays
Accessories
Wetroom Accessories
Tray Accessories
Enclosure Accessories
Taps & Showers
Complete Shower Sets
Bar Mixer Shower Sets
Shower Valves & Controls
1 Outlet Valves
2 Outlet Valves
3 Outlet Valves
Bar Shower Valves
Shower Kits
Rigid Riser Kits
Shower Slide Rail Kits
Shower Accessories
Fixed Heads
Shower Arms
Hand Held Shower Kits
Body Jets
Shower Parts
Basin Taps
Mono Basin Taps
Mini Basin Taps
Tall Basin Taps
Wall Mounted Basin Taps
Pillar Taps
Bidet Taps
Bath Taps
Bath Fillers
Bath Shower Mixers
Bath Pillar Taps
Tap Accessories
Wastes
Tap Extras
Heating
Radiators
Single Panel Radiators
Double Panel Radiators
Heated Towels Rails
Traditional Column Radiators
Electric Heating
Heating Accessories
Radiator Valves
Heating Extras
Kitchens
Kitchen Sinks
Countertop Sinks
Undermount Sinks
Butler Sinks
Belfast Sinks
Cleaner Sinks/Industrial
Work Stations
Kitchen Taps
Kitchen Accessories
Bathroom Suites
Cloakroom Suites
Ceramic Suites
Doc M Packs
Toilet & Basin Sets
Enclosure Suites
Enclosures & Tray Packs
Enclosure & Showering Packs
Components (Trade)
Ceramics Components
Basin Only
Cistern Only
Pan Only
Pedestal Only
Furniture Components
Furniture Basins
Furniture Worktop
Vanity Units
Search
Account
Orders
My points
(0)
Comparison list
Wish list
Sign in
E-mail
Password
Remember me
Sign in
Registration
Forgot your password?
Basket
Cart is empty
Home
Baths
Shower Baths
Square Shower Baths
Nuie 1600mm Left-Hand Square Shower Bath With Legs
Search
view
Nuie 1600mm Left-Hand Square Shower Bath With Legs
WBS1685L
£
582.00
24 In Stock
Please sign in to buy
Add to wish list
Add to comparison list
Vendor
Roxor
Description
nuie Shower Baths 1600mm Left Hand Square Shower Bath
Nuie 1600mm Left-Hand Square Shower Bath With Legs
£
582.00
Please sign in to buy
Add to comparison list
Features & Benefits
Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option
Designed and built to the highest quality
Sanitary Grade Acrylic
Un-drilled
Supplied with leg set
Bath panels sold separately
Details
General
Brand
Nuie
Style
Contemporary
Dimensions & Capacity
Displaced Capacity (L)
130 Litre
Product Height
390 mm
Product Length
1600 mm
Product Width
850 mm
Volume (Literage)
200 Litre
Design & Materials
Colour
White
Bath Shape
L-Shaped
Bath Style
Shower Bath
Embossed Base
No
Material Thickness
MILLIMETER
Product Material
Acrylic
Features & Benefits
Slip Resistant
No
Installation & Compatibility
Assembly Required
No
Drilled for Taps
No
Waste Position
End Of Bath
What's Included
Includes Waste
No
Adjustable Legs Supplied
Yes
Bath Panel Included
No
Seat Included
No
Fixings Included
No
Includes Grips
No
Includes Overflow
Yes
Compliance & Warranty
Guarantee no. of years
5 Years
CE
No
Downloads
Datasheets
WBS1685L-datasheet.pdf
File size:
2,525 Kb
Fitting Instructions
shower_bath_v2_fi.pdf
File size:
1 Kb
Complete The Look
Bath Screens /
L-Shaped Bath Screen
£
205.00
61 In Stock
Shower Slide Rail Kits /
Shower Kits Slide Rail Kit
£
96.00
36 In Stock
Bath Shower Mixers /
Arvan Deck Mounted Bath Shower Mixer With Kit
£
313.00
48 In Stock
You May Also Like
P Shaped Shower Baths /
Nuie 1600mm Right-Hand P Shaped Shower Bath With Legs
£
553.00
60 In Stock
P Shaped Shower Baths /
Nuie 1600mm Left-Hand P Shaped Shower Bath With Legs
£
553.00
71 In Stock
Square Shower Baths /
Nuie 1600mm Right-Hand Square Shower Bath With Legs
£
582.00
56 In Stock